Construction Industry Survey (48/49)

1 tableaux et 132 postes de l’enquête KOSIS « Construction Industry Survey », en chiffres et graphiques annuels.

공사지역/공사종류별 계약액,기성액,미기성액(해외건설)

Retour en haut

공사종류별 총계 · 공사지역별 총계

Value of orders received in original contract

2008 48,901,833Mill. Won2024 41,918,880Mill. Won▼ −14.3%

Building construction Value of orders received in original contract

2008 8,866,956Mill. Won2024 5,130,317Mill. Won▼ −42.1%

Detached & tenement house Value of orders received in original contract

2008 245,093Mill. Won2024 5,338Mill. Won▼ −97.8%

Apartment Value of orders received in original contract

2008 1,564,906Mill. Won2024 132,213Mill. Won▼ −91.6%

Residential shop Value of orders received in original contract

2008 1,484,183Mill. Won2024 115,056Mill. Won▼ −92.2%

Market department store Value of orders received in original contract

2008 161,860Mill. Won2024 323,709Mill. Won▲ +100.0%

Business building Value of orders received in original contract

2008 687,132Mill. Won2024 70,276Mill. Won▼ −89.8%

Public building Value of orders received in original contract

2008 34,481Mill. Won2024 54,637Mill. Won▲ +58.5%

Hotel & lodgings Value of orders received in original contract

2008 644,419Mill. Won2024 575,774Mill. Won▼ −10.7%

Educational facilities Value of orders received in original contract

2008 378,330Mill. Won2024 3,563Mill. Won▼ −99.1%

Hospital Value of orders received in original contract

2008 363,888Mill. Won2024 77,799Mill. Won▼ −78.6%

Public & Performance Value of orders received in original contract

2008 402Mill. Won2023 11Mill. Won▼ −97.3%

Stadium & playground Value of orders received in original contract

2008 570Mill. Won2024 19,862Mill. Won▲ +3384.6%

Exhibition pavilion Value of orders received in original contract

2008 306,141Mill. Won2024 13,774Mill. Won▼ −95.5%

Factory & workshop Value of orders received in original contract

2008 1,327,882Mill. Won2024 3,622,204Mill. Won▲ +172.8%

Machine installation (except plant) Value of orders received in original contract

2008 35,521Mill. Won2024 334Mill. Won▼ −99.1%

Substation power plant Value of orders received in original contract

2008 246,757Mill. Won2024 88,818Mill. Won▼ −64.0%

Warehouse garage terminal building Value of orders received in original contract

2008 138,383Mill. Won2024 2,960Mill. Won▼ −97.9%

Hazardous property storehouse Value of orders received in original contract

2008 5,548Mill. Won2023 8,354Mill. Won▲ +50.6%

Other Building Facilities Value of orders received in original contract

2008 1,240,505Mill. Won2024 9,763Mill. Won▼ −99.2%

Civil engineering Value of orders received in original contract

2008 13,342,045Mill. Won2024 2,732,785Mill. Won▼ −79.5%

General road Value of orders received in original contract

2008 1,336,104Mill. Won2024 50,433Mill. Won▼ −96.2%

Value of construction completed

2008 32,695,270Million Won2024 48,020,339Million Won▲ +46.9%

Building construction Value of construction completed

2008 7,051,808Million Won2024 17,936,096Million Won▲ +154.3%

Detached & tenement house Value of construction completed

2008 85,388Million Won2024 4,993Million Won▼ −94.2%

Apartment Value of construction completed

2008 489,321Million Won2024 232,792Million Won▼ −52.4%

Residential shop Value of construction completed

2008 321,334Million Won2024 249,680Million Won▼ −22.3%

Market department store Value of construction completed

2008 356,704Million Won2024 36,363Million Won▼ −89.8%

Business building Value of construction completed

2008 576,146Million Won2024 873,595Million Won▲ +51.6%

Public building Value of construction completed

2008 55,142Million Won2024 44,192Million Won▼ −19.9%

Hotel & lodgings Value of construction completed

2008 654,478Million Won2024 277,811Million Won▼ −57.6%

Educational facilities Value of construction completed

2008 122,767Million Won2024 102,649Million Won▼ −16.4%

Hospital Value of construction completed

2008 65,887Million Won2024 292,692Million Won▲ +344.2%

Traditional style & Cultural building Value of construction completed

2008 628Million Won2024 11,967Million Won▲ +1805.6%

Public & Performance Value of construction completed

2008 22,986Million Won2023 11Million Won▼ −100.0%

Stadium & playground Value of construction completed

2008 1,764Million Won2024 81,391Million Won▲ +4514.0%

Exhibition pavilion Value of construction completed

2008 113,052Million Won2024 30,880Million Won▼ −72.7%

Factory & workshop Value of construction completed

2008 2,051,125Million Won2024 15,077,797Million Won▲ +635.1%

Machine installation (except plant) Value of construction completed

2008 27,889Million Won2024 348Million Won▼ −98.8%

Substation power plant Value of construction completed

2008 620,337Million Won2024 54,024Million Won▼ −91.3%

Warehouse garage terminal building Value of construction completed

2008 456,622Million Won2024 557,428Million Won▲ +22.1%

Hazardous property storehouse Value of construction completed

2008 68Million Won2019 4,524Million Won▲ +6552.9%

Other Building Facilities Value of construction completed

2008 1,030,003Million Won2024 7,438Million Won▼ −99.3%

Civil engineering Value of construction completed

2008 6,954,385Million Won2024 7,664,555Million Won▲ +10.2%

General road Value of construction completed

2008 594,716Million Won2024 675,077Million Won▲ +13.5%

Value of construction completed in original contract

2008 30,812,986Million Won2024 44,307,351Million Won▲ +43.8%

Building construction Value of construction completed in original contract

2008 6,396,676Million Won2024 16,929,147Million Won▲ +164.7%

Detached & tenement house Value of construction completed in original contract

2008 78,520Million Won2024 2,065Million Won▼ −97.4%

Apartment Value of construction completed in original contract

2008 450,136Million Won2024 232,726Million Won▼ −48.3%

Residential shop Value of construction completed in original contract

2008 301,948Million Won2024 246,326Million Won▼ −18.4%

Market department store Value of construction completed in original contract

2008 248,830Million Won2024 32,506Million Won▼ −86.9%

Business building Value of construction completed in original contract

2008 545,514Million Won2024 853,743Million Won▲ +56.5%

Public building Value of construction completed in original contract

2008 39,520Million Won2024 24,759Million Won▼ −37.4%

Hotel & lodgings Value of construction completed in original contract

2008 574,492Million Won2024 252,494Million Won▼ −56.0%

Educational facilities Value of construction completed in original contract

2008 22,680Million Won2024 101,876Million Won▲ +349.2%

Hospital Value of construction completed in original contract

2008 57,573Million Won2024 268,508Million Won▲ +366.4%

Public & Performance Value of construction completed in original contract

2008 20,988Million Won2023 11Million Won▼ −99.9%

Stadium & playground Value of construction completed in original contract

2008 1,619Million Won2024 81,391Million Won▲ +4927.2%

Exhibition pavilion Value of construction completed in original contract

2008 106,621Million Won2024 22,469Million Won▼ −78.9%

Factory & workshop Value of construction completed in original contract

2008 1,906,849Million Won2024 14,249,534Million Won▲ +647.3%

Machine installation (except plant) Value of construction completed in original contract

2008 855Million Won2024 314Million Won▼ −63.3%

Substation power plant Value of construction completed in original contract

2008 585,217Million Won2024 42,903Million Won▼ −92.7%

Warehouse garage terminal building Value of construction completed in original contract

2008 455,753Million Won2024 501,395Million Won▲ +10.0%

Hazardous property storehouse Value of construction completed in original contract

2008 62Million Won2019 4,524Million Won▲ +7196.8%

Other Building Facilities Value of construction completed in original contract

2008 999,333Million Won2024 4,116Million Won▼ −99.6%

Civil engineering Value of construction completed in original contract

2008 6,180,300Million Won2024 7,446,665Million Won▲ +20.5%

General road Value of construction completed in original contract

2008 462,796Million Won2024 671,422Million Won▲ +45.1%

Value of construction completed in subcontract

2008 1,882,284Million Won2024 3,712,988Million Won▲ +97.3%

Building construction Value of construction completed in subcontract

2008 655,132Million Won2024 1,006,949Million Won▲ +53.7%

Detached & tenement house Value of construction completed in subcontract

2008 6,868Million Won2024 2,928Million Won▼ −57.4%

Apartment Value of construction completed in subcontract

2008 39,184Million Won2024 66Million Won▼ −99.8%

Residential shop Value of construction completed in subcontract

2008 19,385Million Won2024 3,354Million Won▼ −82.7%

Market department store Value of construction completed in subcontract

2008 107,873Million Won2024 3,857Million Won▼ −96.4%

Business building Value of construction completed in subcontract

2008 30,632Million Won2024 19,852Million Won▼ −35.2%

Public building Value of construction completed in subcontract

2008 15,622Million Won2024 19,433Million Won▲ +24.4%

Hotel & lodgings Value of construction completed in subcontract

2008 79,986Million Won2024 25,318Million Won▼ −68.3%

Educational facilities Value of construction completed in subcontract

2008 100,087Million Won2024 773Million Won▼ −99.2%

Hospital Value of construction completed in subcontract

2008 8,313Million Won2024 24,184Million Won▲ +190.9%

Stadium & playground Value of construction completed in subcontract

2008 145Million Won2023 640Million Won▲ +341.4%

Exhibition pavilion Value of construction completed in subcontract

2008 6,431Million Won2024 8,411Million Won▲ +30.8%

Factory & workshop Value of construction completed in subcontract

2008 144,275Million Won2024 828,264Million Won▲ +474.1%

Machine installation (except plant) Value of construction completed in subcontract

2008 27,033Million Won2024 34Million Won▼ −99.9%

Substation power plant Value of construction completed in subcontract

2008 35,120Million Won2024 11,120Million Won▼ −68.3%

Warehouse garage terminal building Value of construction completed in subcontract

2008 869Million Won2024 56,033Million Won▲ +6348.0%

Other Building Facilities Value of construction completed in subcontract

2008 30,670Million Won2024 3,322Million Won▼ −89.2%

Civil engineering Value of construction completed in subcontract

2008 774,085Million Won2024 217,890Million Won▼ −71.9%

General road Value of construction completed in subcontract

2008 131,920Million Won2024 3,655Million Won▼ −97.2%

Value of carry-over work

2008 96,203,246Million Won2024 168,700,510Million Won▲ +75.4%

Building construction Value of carry-over work

2008 21,473,828Million Won2024 33,839,493Million Won▲ +57.6%

Detached & tenement house Value of carry-over work

2008 191,969Million Won2024 93,964Million Won▼ −51.1%

Apartment Value of carry-over work

2008 6,218,199Million Won2024 10,146,015Million Won▲ +63.2%

Residential shop Value of carry-over work

2008 2,826,638Million Won2024 3,240,075Million Won▲ +14.6%

Market department store Value of carry-over work

2008 762,591Million Won2024 545,808Million Won▼ −28.4%

Business building Value of carry-over work

2008 1,521,204Million Won2024 1,522,933Million Won▲ +0.1%

Public building Value of carry-over work

2008 91,883Million Won2024 364,678Million Won▲ +296.9%

Hotel & lodgings Value of carry-over work

2008 1,773,085Million Won2024 2,221,043Million Won▲ +25.3%

Educational facilities Value of carry-over work

2008 421,130Million Won2024 230,649Million Won▼ −45.2%

Hospital Value of carry-over work

2008 562,792Million Won2024 789,957Million Won▲ +40.4%

Church & temple Value of carry-over work

2013 21,976Million Won2024 22,010Million Won▲ +0.2%

Public & Performance Value of carry-over work

2008 12,503Million Won2024 1,264Million Won▼ −89.9%

Stadium & playground Value of carry-over work

2009 4,536Million Won2024 91,605Million Won▲ +1919.5%

Exhibition pavilion Value of carry-over work

2008 232,471Million Won2024 14,381Million Won▼ −93.8%

Factory & workshop Value of carry-over work

2008 1,625,972Million Won2024 11,877,025Million Won▲ +630.5%

Machine installation (except plant) Value of carry-over work

2008 26,060Million Won2024 132Million Won▼ −99.5%

Substation power plant Value of carry-over work

2008 1,782,266Million Won2024 709,172Million Won▼ −60.2%

Warehouse garage terminal building Value of carry-over work

2008 1,482,680Million Won2024 1,894,523Million Won▲ +27.8%

Hazardous property storehouse Value of carry-over work

2008 5,486Million Won2024 8,354Million Won▲ +52.3%

Other Building Facilities Value of carry-over work

2008 1,936,630Million Won2024 63,691Million Won▼ −96.7%

Civil engineering Value of carry-over work

2008 20,513,089Million Won2024 29,728,926Million Won▲ +44.9%

General road Value of carry-over work

2008 1,707,923Million Won2024 903,884Million Won▼ −47.1%

Value of orders received

2008 48,901,833Million Won2024 41,918,880Million Won▼ −14.3%

Building construction Value of orders received

2008 8,866,956Million Won2024 5,130,317Million Won▼ −42.1%

Detached & tenement house Value of orders received

2008 245,093Million Won2024 5,338Million Won▼ −97.8%

Apartment Value of orders received

2008 1,564,906Million Won2024 132,213Million Won▼ −91.6%

Residential shop Value of orders received

2008 1,484,183Million Won2024 115,056Million Won▼ −92.2%

Market department store Value of orders received

2008 161,860Million Won2024 323,709Million Won▲ +100.0%

Business building Value of orders received

2008 687,132Million Won2024 70,276Million Won▼ −89.8%

Public building Value of orders received

2008 34,481Million Won2024 54,637Million Won▲ +58.5%

Hotel & lodgings Value of orders received

2008 644,419Million Won2024 575,774Million Won▼ −10.7%

Educational facilities Value of orders received

2008 378,330Million Won2024 3,563Million Won▼ −99.1%

Hospital Value of orders received

2008 363,888Million Won2024 77,799Million Won▼ −78.6%

Public & Performance Value of orders received

2008 402Million Won2023 11Million Won▼ −97.3%

Stadium & playground Value of orders received

2008 570Million Won2024 19,862Million Won▲ +3384.6%

Exhibition pavilion Value of orders received

2008 306,141Million Won2024 13,774Million Won▼ −95.5%

Factory & workshop Value of orders received

2008 1,327,882Million Won2024 3,622,204Million Won▲ +172.8%

Machine installation (except plant) Value of orders received

2008 35,521Million Won2024 334Million Won▼ −99.1%

Substation power plant Value of orders received

2008 246,757Million Won2024 88,818Million Won▼ −64.0%

Warehouse garage terminal building Value of orders received

2008 138,383Million Won2024 2,960Million Won▼ −97.9%

Hazardous property storehouse Value of orders received

2008 5,548Million Won2023 8,354Million Won▲ +50.6%

Other Building Facilities Value of orders received

2008 1,240,505Million Won2024 9,763Million Won▼ −99.2%

Civil engineering Value of orders received

2008 13,342,045Million Won2024 2,732,785Million Won▼ −79.5%

General road Value of orders received

2008 1,336,104Million Won2024 50,433Million Won▼ −96.2%

Ce qu’est cette statistique

Construction Industry Survey· - 건설업체 → 건설관련기관(6개) → 국가데이터처

Termes clés
원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자 Lire la suite

원재료비 : 공사시공을 위하여 실제로 투입(사용)된 원재료의 구입 가격에 운임을 포함한 금액원도급업체가 다른 업체와 하도급 계약을 맺을 경우의 원재료비는 ① 원도급업체에서 원재료를 제공하는 조건이면 원도급업체에 계상하고, ② 하도급업체에서 일괄구입 사용하는 조건이면 하도급업체에서 원재료비를 계상보조재료비 : 손익계산서 및 건설원가 명세서상의 소모품비, 사무용품비수선비 : 건설 활동을 위하여 보유하고 있는 유형고정자산의 정상적인 기능유지를 위하여 그 수리를 외부에 의뢰하였을 경우에 지출된 제비용으로서 회계상 경비로 처리된 부분수도광열비 : 조사대상 기간 중 동력 및 자가 발전용으로 사용한 모든 연료의 사용금액과 전기료, 가스료, 수도료 등을 말함급여총액 : 손익계산서의 판매비와 관리비 중 임원급여, 급료와 임금, 제수당 및 상여금, 잡급과 공사원가명세서의 노무비 중 급여, 임금, 제수당, 기타급여를 포함하며, 해외 건설공사의 경우 현지 고용한 외국인 노무자에 대한 급여는 제외함퇴직급여 : 손익계산서 및 공사원가명세서상의 퇴직급여 및 당년도 퇴직급여충당금전입액이 포함복리후생비 : 종업원에 대한 급여 이외의 위생, 보건, 위안, 요양 등 종업원의 복지와 후생을 위하여 지출한 제비용을 말하는데, 장기 결근자에 대한 급여, 양로연금, 종업원 레크레이션을 위한 운동시설, 영화, 여행, 운동회개최 등을 위한 제비용을 포함대손상각비 : 손익계산서상의 대손상각비로서 외상매출금, 받을 어음 등 채권의 추산액 또는 경상적인 대손상각을 말함임차료 : 건설활동을 위하여 제3자로부터 건물, 장비, 토지 등을 임차하였을 경우 그에 대한 임차료를 말함. 해외건설공사의 경우 외국인으로부터 임차한 대가로 지불한 임차료는 제외세금과공과 : 건설업활동과 관련된 각종 세금 및 공과금으로 등록세, 재산세, 취득세, 사업소득세, 자동차세, 협회비 등 공사원가 및 판매비와 관리비 부문에 포함되는 모든 세금과 공과금을 말한다.해외공사의 경우 외국정부 등에 납부한 조세공과는 제외하였으며 기타영업비용에 포함하였다.감가상각비 : 건물, 건설장비 등의 유형고정자산에 대한 감가상각비와 무형자산에 대한 상각비의 합계를 말함외주공사비 : 다른 업체에 하도급을 주었을 경우 하도급 업체에서 시공한 기성 부분에 대하여 지출하였거나 지출하여야 할 외주공사비를 말하며 연차 공사의 경우에는 조사대상 기간에 지출한 금액 또는 지출하여야 할 금액을 말함기타영업비용 : 상기 언급한 [원재료비, 보조재료비, 수선비, 수도광열비, 급여총액, 퇴직급여, 복리후생비, 임차료, 세금과공과, 감가상각비, 대손상각비, 외주공사비]를 제외한 손익계산서 및 공사원가명세서상의 건설 활동을 위하여 지출한 비용의 합계를 말함. 해외 건설공사의 경우에는 외국인에게 지불한 급여 및 임차료, 외국정부에 지출한 조세공과 등을 기타영업비용에 포함시킴부가가치 : 부가가치는 기업이 산업 활동을 한 결과 생산물의 가치 등에 새로 부가한 가치를 의미하며 이 조사의 부가가치는 다음과 같이 구함부가가치 = 급여총액 + 퇴직급여(퇴직급여충당금전입액 포함) + 복리후생비(보험료 포함) + 임차료 + 세금과공과 + 대손상각비 + 건설영업이익 + 납부부가가치세건설공사내역 : 건설공사내역은 조사기준년도에 이룩한 모든 공사를 건별로 계약액, 당년도 기성액 등을 공사종류별, 발주자별 및 공사 지역별로 구분 조사해외공사의 경우 외환금액은 조사기준연도 12. 31. 기준 외환은행 환율에 의한 환산치임계약종류 : 도급방법에 따라 원도급과 하도급으로 구분 조사하였음. 원도급이란 발주자로부터 1차적으로 도급받은 경우이며, 하도급이란 재도급 또는 하청을 말함이 조사에서는 국내 타 건설 업체로부터 도급받은 경우 하도급으로 간주하였으며 국내 건설회사가 아닌 외국건설 회사나 국내 종합무역상사 등에서 하도급 받은 경우에는 원도급으로 하였음. 또한 건설회사의 자기 건설이나 산하기업, 모기업을 위한 직영공사인 경우 원도급으로 하였음.기성액(공사액) : 기성액(공사액)이라 함은 건설업체에서 공사의 완공여부나 대금의 수취여부 등과는 관계없이 당해년도에 시공한 공사액을 말함. 즉, 공사수주금액 중 공사의 일부를 다른 업체에 하도급(원도급자의 외주공사액)을 준 경우에는 원도급자의 기성액에서 제외하였음당해년도 계약액(수주액) : 조사대상 업체가 발주자 또는 원도급자와 조사기준년도에 체결한 공사 계약액의 합계미기성액 : 조사기준년도에 시공하지 못하고 차년도로 이월된 공사액『당년도계약액 및 이월된 공사액 - 당년도 기성액』= 미기성액발주자 : 발주자라 함은 건설공사를 건설업자에게 도급하는 자를 말함. 다만, 수급인으로서 도급받은 건설공사를 하도급하는 자를 제외함도급 : 도급이라 함은 건설공사를 완성할 것을 약정하고, 상대방이 그 일의 결과에 대하여 대가를 지급할 것을 약정하는 계약원도급공사 : 발주자로부터 직접 건설공사를 완성할 것을 약정한 공사하도급공사 : 발주자로부터 건설공사를 도급받은 건설업자로부터 재 도급받은 건설공사를 말함조직형태 : 경영주체인 각 기업체의 법적 조직형태를 말하며 이 조사에서는 회사법인,회사이외의 법인 및 개인의 세 가지 형태로 구분법인 : 상법, 민법, 특별법에 의하여 설립되고 법인 등기를 완료하여 법인격을 취득하고 있는 기업체기술자, 기술공 : 건설공사의 설계 및 시공에 관한 전반적인 감독업무를 수행할 수 있는 자, 또는 전문직기술자가 지시한 작업내용을 원활하게 응용하여 기술공의 업무를 충분히 수행할 수 있는 자피고용자 : 일정한 산출기준에 의하여 임금, 봉급 또는 이에 준하는 형식의 급여를 받고 그 기업체에 고용되어 있는 모든 남여 종업원을 말하는데, 이에는 상용은 물론 임시 및 일용 종업원도 포함시켰음. 그러나 장기결근자(3개월 이상) 및 군복무자 등은 제외하였고, 해외공사의 경우에는 해외에서 근무하는 우리나라 피고용자만 조사하였고 외국에서 현지 고용한 외국인 피고용자는 제외함개인 : 법인체가 아닌 개인소유의 기업체를 말하는 것으로서 여기서는 법인격이 없는 조합과 같은 임의단체도 포함자 본 금 : 조사기준년도 12.31. 현재로 납입이 완료된 자본금 또는 출자금액종사자수 : 종사자라 함은 그 기업체의 공사현장 혹은 사무실 등을 가리지 않고, 조사대상 기간 중 건설업을 위한 업무에 종사한 피고용자수와 사업주 및 무급가족종사자수의 합계상용종사자 : 1년 이상의 고용계약에 의하여 실제의 취업시간에 관계없이 일정한 정액급여를 받는 종사자사무 및 기타 종업원 : 공사현장업무에는 직접 관여하지 않고 관리직, 전문직, 사무직 업무에 종사하는 자와 이들의 보조원 즉 급사, 사환, 수위, 승용차의 운전사 등을 말함기능공 : 건설공사의 시공에 직접 종사하는 자로서 ① 고등학교 졸업자와 ② 6개월 이상 조직적인 기술습득을 요하는 직종에서 1년 이상 경험을 가진 자, 또는 국가에서 공인하는 동등한 자격을 가진 자로서 통칭 숙련공을 말함임시종사자 : 1년 미만의 고용계약에 의하여 취업일수 및 취업시간에 따라 임금을 받는 잡부,인부,단순노무자 등을 포함한 현장근로 종사자사업주 및 무급가족종사자 : 사업주(출자자포함)와 그의 가족으로서 업체의 운영을 위하여 사무 또는 노무에 통상 작업시간의 ⅓ 이상을 종사하되 일정한 봉급이나 임금을 받지 않은 자를 말함. 사업주의 가족이라도 상시 근무에 종사하고 이에 대한 임금 또는 봉급의 형식으로 급여를 받은 자는 피고용자에 포함연간 급여액 : 조사대상기간에 정기 또는 부정기를 가리지 않고 피고용자에게 노무의 대가로 지급된 모든 현금급여,조사기준년도 이전의 급여로서 체불되었던 것을 조사기준년도 중에 지급한 것은 제외하고, 반면에 조사기준년도 중에 지급하여야 할 급여로서 미지급된 것은 포함매 출 액 : 매출액이라 함은 건설업체에서 당년도에 시공한 공사수익금액과 분양금액 등을 포함함. 미완성공사는 공사가 진행된 정도에 따라 수익이 실현된 것으로 봄.단, 공사수주 금액 중 공사의 일부를 다른 업체에 외주를 준 경우에는 제외(건설비용의 외주공사비로 조사)건설비용 : 1년간의 건설공사에 대하여 발생한 비용의 총계를 말함. 즉 건설공사원가명세서상의 경비와 손익계산서상의 판매비와 관리비를 말하는데, 건설업 이외의 타 산업을 겸하는 기업체는 겸업부문의 비용은 제외

Pourquoi elle est produite
우리나라 건설업부문의 구조 및 산업활동 실태를 파악하여 정책수립에 필요한 기초자료 제공 활용분야 : 건설관련 정책수립, GDP.산업연관표 및 GRDP작성, 월간조사 모집단 자료로 활용
Ce qui est observé
기업체

🔴 Cette explication a été rédigée par l’organisme qui produit la statistique. DATA CLOCK KOREA ne l’a ni interprétée ni résumée. L’original est en coréen ; nous ne le traduisons pas, car le traduire en ferait autre chose que les mots de l’organisme.

Source des données

Organisme
국가데이터처
Tableau
산업세분류 및 조직형태별 총괄
Fournisseur
KOSIS 국가통계포털
Période
2008 ~ 2024
Date d’extraction
2026-08-29
Traitement
KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Voir les données sources →